Choose the level of cost intelligence that matches your project stage. Every deliverable is produced to NRM standards and reviewed by chartered quantity surveyors.
High-level budget estimate based on BCIS benchmarks and GIA measurement. Ideal for early feasibility studies.
Elemental cost plan to NRM 1 Level 1 with measured quantities, applied rates, and design risk allowance.
Line-by-line detailed cost plan to NRM 1 Level 2–3 with labour/material/subcontract split.
Complete commercial tender package measured to NRM 2, ready for competitive pricing and contractor appointment.
Complete quantity surveying service from pre-construction through to final account. Bespoke engagement.
A side-by-side view of every deliverable across all five service levels.
| Deliverable | Order of Cost | Preliminary Cost Plan | Detailed Cost Plan | Commercial Pack | Full QS Service |
|---|---|---|---|---|---|
| GIA measurement from drawings | \u2713 | \u2713 | \u2713 | \u2713 | \u2713 |
| BCIS benchmark comparison | \u2713 | \u2713 | \u2713 | \u2713 | \u2713 |
| Single-page cost summary | \u2713 | \u2713 | \u2713 | \u2713 | \u2713 |
| Key assumptions register | \u2713 | \u2713 | \u2713 | \u2713 | \u2713 |
| Full drawing triage report | \u2014 | \u2713 | \u2713 | \u2713 | \u2713 |
| Elemental cost plan (20+ elements) | \u2014 | \u2713 | \u2713 | \u2713 | \u2713 |
| Preliminaries schedule | \u2014 | \u2713 | \u2713 | \u2713 | \u2713 |
| Build programme (Gantt) | \u2014 | \u2713 | \u2713 | \u2713 | \u2713 |
| Detailed line-by-line breakdown | \u2014 | \u2014 | \u2713 | \u2713 | \u2713 |
| Labour / Material / Subcontract split | \u2014 | \u2014 | \u2713 | \u2713 | \u2713 |
| Value engineering recommendations | \u2014 | \u2014 | \u2713 | \u2713 | \u2713 |
| Risk register with cost impacts | \u2014 | \u2014 | \u2713 | \u2713 | \u2713 |
| Procurement strategy advice | \u2014 | \u2014 | \u2713 | \u2713 | \u2713 |
| Measured quantities to NRM 2 | \u2014 | \u2014 | \u2014 | \u2713 | \u2713 |
| Tender documentation pack | \u2014 | \u2014 | \u2014 | \u2713 | \u2713 |
| Tender evaluation matrix template | \u2014 | \u2014 | \u2014 | \u2713 | \u2713 |
| Contractor briefing notes | \u2014 | \u2014 | \u2014 | \u2713 | \u2713 |
| Monthly cost reporting | \u2014 | \u2014 | \u2014 | \u2014 | \u2713 |
| Interim valuations | \u2014 | \u2014 | \u2014 | \u2014 | \u2713 |
| Variation management | \u2014 | \u2014 | \u2014 | \u2014 | \u2713 |
| Final account preparation | \u2014 | \u2014 | \u2014 | \u2014 | \u2713 |
| Dedicated QS assigned | \u2014 | \u2014 | \u2014 | \u2014 | \u2713 |
| Price (+ VAT) | £499 | £1,499 | £2,999 | £4,999 | POA |